SOVIQ AI › Guides › Progress billing software

Progress billing software for construction

Progress billing means getting paid as the work goes in, not when it's finished. It is the only way a contractor can fund a six-month job, and it is also where most payment delays start, because every month's bill depends on last month's.

By Vagish Kapila, founder of Varshyl Inc. and a licensed California general contractor · Updated 2026-11-16

What progress billing is

On a lump-sum construction contract you don't invoice at the end. Each month you bill the percentage of each line item that is complete, less what you've already billed, less retainage. The owner pays the difference. Over the life of the job the applications add up to the contract sum (plus approved change orders) minus retainage, which is released at the end.

The sequence each month: measure progress by line, add stored materials, compute total to date, subtract previous billing, apply retainage, submit, wait for certification, get paid. The document that carries it is the pay application, with a continuation sheet listing each line of the schedule of values.

The math, with one line

A $60,000 roofing line. Last month you were 40% complete ($24,000 billed to date). This month you reach 75%.

Multiply by forty lines, add change orders and stored materials, and you understand why the spreadsheet breaks.

Four mistakes that delay payment

  1. Previous billing doesn't match last month's total. The owner's reviewer checks this first.
  2. Percent complete is not defensible. "We're 80%" with no backup gets cut to 60% by the inspector. Photos and quantities win.
  3. Retainage calculated on this period instead of total to date, or at the wrong rate on stored materials.
  4. Change orders billed before approval, or approved change orders that never made it onto the continuation sheet, so the contract sum to date is wrong.

What progress billing software should do

SOVIQ does all of this, and reads the schedule of values or the bid you already have so the setup is minutes rather than an afternoon. It is $150 a month flat with the AI included.

Frequently asked

What is the difference between progress billing and milestone billing?

Progress billing bills the percentage complete of each line every period. Milestone billing bills a fixed amount when a defined event happens (foundation poured, rough-in inspected). Commercial construction mostly uses progress billing; some residential and design contracts use milestones.

How often is progress billing done?

Monthly on nearly all commercial contracts, with a cutoff date set in the contract or by the GC.

What is retainage in progress billing?

A percentage (commonly 5–10%) of each payment the owner withholds until the work is complete, as security. It accumulates over the job and is released at or after substantial completion.

Can progress billing software handle cost-plus or time-and-materials contracts?

Those bill actual costs, not percent complete, and need a different document set. SOVIQ is built for lump-sum and GMP contracts billed against a schedule of values.

Do this with SOVIQ AI

Upload your schedule of values, bid or proposal and SOVIQ produces the pay application, continuation sheet and change orders for you. $150 a month, AI included.

Start billing with SOVIQ →   See pricing